Sydney City South/West CBD Data Centre – Main Switchroom Construction

The scope of works for this project was to refurbish an existing level 1 Equipment Room for the fitout of New Main Switch Rooms with all the associated peripheral equipment. Included was the demolition of an existing Equipment room, Office and Meter Room, construction of new Switch Rooms and new Mechanical Plant Room. A new air conditioning system was installed, including, light, power, Vesda and modifications to the existing fire sprinkler system.. Value $ 650k