Fresenius Kabi QLD – Generator Installation

Installation of a 450kVA containerised generator set, 2 x 240mm sub-mains and 630amp ATS. This generator was getting installed to protect the temperature sensitive chemotherapy drugs stored on-site, in the case of a power outage.

PROJECT HIGHLIGHTS

The generator will commence operation on a power outage allowing the whole site to be powered for up to 24 hours. The site can keep its complex cooling system operational allowing the correct storage of the drugs as well as allowing the site to continue producing live saving treatments.

All works where completed in forecast time and the installation came in on budget.

Want to know more about generator installation services?